Block and Beam Flooring with Gas Membrane, Insulation Boards, and Screed Installation at Nanaimo Way, Kingswinford
Introduction
Modern construction projects demand robust and energy-efficient flooring solutions that meet safety and environmental standards. At Nanaimo Way in Kingswinford, we successfully completed the installation of block and beam flooring, a gas membrane, insulation boards, and screed. This case study outlines the process, challenges, and results of this comprehensive project.
Client Background
The project was commissioned by a property developer constructing a new residential unit. They required a flooring solution that was durable, well-insulated, and compliant with regulations regarding gas protection. The work involved multiple phases, from structural flooring installation to finishing with screed, ensuring readiness for the final floor covering.
Challenge
This project presented several key challenges:
Complex Installation: Combining block and beam flooring with gas membrane, insulation boards, and screed required careful sequencing and precision.
Gas Protection Compliance: The site was identified as having potential ground gas risks, necessitating the installation of a high-performance gas membrane.
Tight Schedule: The client required all work to be completed efficiently to stay on track with the overall construction timeline.
Site Conditions: Uneven ground and wet weather posed challenges during the initial stages of the installation.
Solution
To address these challenges, we employed a structured and systematic approach:
Ground Preparation: The site was levelled and compacted to create a stable base for the block and beam flooring.
Precision Installation: Our team carefully placed and secured the block and beam flooring system, ensuring a stable and durable structure.
Gas Membrane Application: A high-quality gas membrane was installed, overlapping and sealed to prevent any gas ingress, meeting all compliance requirements.
Insulation and Screed: Rigid insulation boards were laid on top of the gas membrane to enhance thermal efficiency. This was followed by the application of a smooth, durable screed to provide a strong base for the final floor finish.
Weather Mitigation: Work schedules were adjusted to avoid delays caused by adverse weather, ensuring timely completion.
Results
The project was completed on schedule, with the following outcomes:
Durable Flooring System: The block and beam structure provides exceptional strength and stability for the property.
Gas Protection Assurance: The gas membrane installation ensures compliance with regulations and protects the building from potential ground gas ingress.
Improved Energy Efficiency: The insulation boards significantly enhance thermal performance, reducing heat loss and improving energy efficiency.
Smooth Finish: The screed layer provides a perfect surface for further flooring installation.
Client Satisfaction: The client praised the seamless execution and high-quality finish of the work, highlighting our team’s professionalism and attention to detail.
Conclusion
This project at Nanaimo Way, Kingswinford, demonstrates our capability to deliver comprehensive flooring solutions that meet modern construction standards. From structural integrity to thermal efficiency and gas protection, we ensured a flawless outcome that aligns with the client’s requirements and regulatory standards.